1 16
ADVERTISEMENT
Marea cable coiled on the installation ship
Run Studios
Marea cable inside the installation ship
Run Studios
Marea cable closeup
Run Studios
Installation staff prepare to install the Marea cable
Run Studios
Preparation for installation of the Marea cable
Run Studios
Installation of the Marea cable begins
Run Studios
Marea Cable landing on shore in Virginia Beach
Run Studios
Connecting the Marea cable on shore in Virginia Beach
Run Studios
Run Studios
Marea cable installation on land in Virginia Beach
Run Studios
Marea cable final installation on shore in Virginia Beach
Run Studios
US Senator Tim Kaine speaking at the event celebrating completion of the Marea cable in September 22
Microsoft
Microsoft president Brad Smith speaking at the event celebrating completion of the Marea submarine cable in September 2017
Microsoft
Erin Egan, VP of US public policy, Facebook, speaking at the event celebrating completion of the Marea submarine cable in September 2017
Microsoft
Rafael Arranz, chief operating officer, Telxius, speaking at the event celebrating completion of the Marea submarine cable in September 2017
Microsoft
Virginia governor Terry McAuliffe speaking at the event celebrating completion of the Marea submarine cable in September 2017
Microsoft
